Final commissioning and power testing completed

After a few minor delays, the final odds and ends have now been completed.

Yesterday we performed a full end-to-end power test, checking out how all critical power components react to a mains failure.  I’m pleased to say that everything went perfectly.

With all the other critical aspects of the build complete, in particular the air conditioning and our diverse fibre links back to both Reynolds House and Telecity Williams, we’ll be installing new servers in Turing later this week.

Thanks to everyone who’s been watching our datacentre blog.  We’ll be switching the webcam off today as there will be live servers in here shortly.  If you’d like a tour of our facilities, please get in touch.

This entry was posted on 23/06/2009 in Turing House Datacentre Build by Daniel Keighron-Foster.