Room cleaning and painting

Now that the bulk of the heavy work has been completed, the room has been cleaned and painted.  If you watch our webcam you’ll see that the vented ceiling tiles have also been installed, which will form a hot air return plenum to the air conditioning units.

This entry was posted on 29/05/2009 in Turing House Datacentre Build by Daniel Keighron-Foster.

Comments are closed.