Danger! Danger! High Voltage!

We’re thrilled to announce that our dedicated electricity feed from the utility company has now been made live.  This has been eagerly awaited by us, as really, a datacentre is pretty useless without power, but more to the point, we can’t do much of the testing of our electrical infrastructure without the power on!

Anyway, this caused a mini-celebration in our office this afternoon, when combined with the fact that we’ve been shortlisted for the Best Dedicated Hosting provider award at the ISPAs.

This entry was posted on 20/05/2009 in Turing House Datacentre Build by Daniel Keighron-Foster.

Leave a Reply